Overview
About Eco Drill Ltd
Eco Drill is a directional drilling and utility installation contractor based at Advance House on the Chilton Industrial Estate in Chilton, County Durham. The company was established in 2007 and describes itself as self-contained, managing the planning, administration and delivery of its own projects with the aim of completing work safely, on time and on budget.
Its core technique is horizontal directional drilling, a steerable trenchless method of installing underground pipes, conduits and cables without open excavation. Where no-dig methods are not suitable, the company also uses traditional open-cut techniques. It installs power, water, gas, sewer and telecoms services, and provides communications installations for commercial and domestic properties, drawing on its experience in the utility sector.
Green utilities
A growing part of the business serves new-generation energy providers, with cable and duct installation for wind farms, solar farms and electric vehicle charging points.
Testimonials on the site come from Northern Powergrid's connections delivery team, which worked with Eco Drill on cable laying alongside MUS jointers, from a MUS contract manager, and from a project manager at McNicholas who praised the professionalism of the drilling team. The company says it uses the latest available equipment and technology.
What they do
Services
- Horizontal directional drilling
- Power cable and duct installation
- Water and gas service installation
- Sewer installation
- Telecoms and communications ducting
- Wind and solar farm cable routes
- EV charging point installation
Where they work
Location
Listed address: 18b Longfield Rd,,DL14 6XB
Latest from HighwaysIndustry.com
Civil engineering news
Registered company no. 07502940 · Registered since 2011
Is this your company? Add a description, logo, photos and services to your listing.
Claim this listing












